LYNQx ENERGY

LYNQx ENERGY

AI-Powered Energy Operations

GRID FREQ50.02 HzSTABLE
DEMAND UK42.5 GW+1.2%
DEMAND ERCOT68.2 GW+2.8%
SOLAR GEN12.4 GW+8.5%
WIND GEN18.7 GW-3.2%
BATTERY DISP2.8 GW+15%
PEAK PRICE$285/MWh+12%
EV CHARGE4.2 GW+5.1%
99.7%
Grid Stability
+0.2% MoM
2.8 GW
Battery Dispatched
+15% today
0
Outages Predicted
3 Prevented
$1.2M
Trading Revenue
+23% this week

📈 Demand Forecast Agent 24h / 7d / 30d

🇬🇧 UK National Grid42.5 GW
Forecast next 24h: 38.2 - 47.8 GW · Peak: 18:00 · Accuracy: 97.2%
🤖 AI: Cold snap incoming — demand +8% expected tomorrow · Gas plants pre-warmed
🇺🇸 ERCOT Texas68.2 GW
Forecast next 24h: 62.1 - 74.5 GW · Peak: 17:30 · Accuracy: 95.8%
🤖 AI: Data centre load surge detected · +1.2 GW from new Microsoft facility
🇦🇺 NEM Australia28.4 GW
Forecast next 24h: 24.8 - 32.1 GW · Peak: 18:30 · Accuracy: 96.4%
🤖 AI: Heatwave QLD — AC load +15% · Battery dispatched 2.8 GW for peak shaving

🔋 Battery Dispatch Agent Real-Time

Victorian Big BatteryDISPATCHING
450 MW / 900 MWh · SoC: 68% · Cycles today: 2.3x
🤖 AI: Charging at $42/MWh · Discharging FCAS at $285/MWh · Revenue today: $45K
Moss Landing BESSDISPATCHING
400 MW / 1,600 MWh · SoC: 45% · Cycles today: 1.8x
🤖 AI: Peak shaving + CAISO frequency regulation · Revenue today: $38K
Hornsdale Power ReserveSTANDBY
194 MW / 194 MWh · SoC: 92% · Awaiting price spike
🤖 AI: Fully charged · Price trigger set at $350/MWh · Ready to dispatch in <100ms

⚡ Grid Stability Agent Frequency · Voltage · Inertia

Grid Frequency50.02 Hz ✓
Target: 50.00 ± 0.05 Hz · Deviation: +0.02 Hz · Within tolerance
System Inertia142 GVA·s ✓
Minimum: 120 GVA·s · Margin: 18% · Synthetic inertia from batteries active
Voltage Stability400.2 kV ✓
Nominal: 400 kV · Deviation: +0.05% · All zones within ±5%
Renewable Penetration68.4%
Solar: 28.2% · Wind: 32.1% · Hydro: 8.1% · Gas balancing: 31.6%

🔮 Outage Prediction Agent AI-Powered

✅ Transformer T-47 — PreventedRESOLVED
Predicted thermal overload 6hrs ahead · Load redistributed · No outage
🤖 AI: Temperature trending to 98°C (limit 105°C) · Load shifted to T-52 · 12,000 customers protected
✅ Line L-23 — PreventedRESOLVED
Predicted tree contact risk · Vegetation crew dispatched · No outage
🤖 AI: Wind + growth model predicted clearance violation in 48hrs · $8K prevention cost vs $240K outage cost
⚠️ Substation S-12 — MonitoringWATCH
SF6 pressure declining slowly · Maintenance window identified
🤖 AI: 14-day safe window · Crew scheduled for Dec 28 · Backup routing prepared

🤖 5 Grid Agents — Autonomous Control